Overview   History          
 
Name of company Osaka Rasenkan Kogyo Co.,Ltd.
Directorate president Kazuo Koizumi
Inauguration of business March,1912
Establishment of company December,1937
Capital 80 million yen
Location of head office,sales office and plants Head office and  OSAKA  plant 3-12-33,Himesato ,Nishi-yodogawa-ku,Osaka 555-0025, Japan
TEL:06-6473-6151 FAX:06-6473-6150
TOKYO  sales office 2-20-4,7F,Higashi-gotanda,Shinagawa-ku,Tokyo 141-0022, Japan
TEL:03-5423-2600 FAX:03-5423-2611
FUKUROI  plant 1700,Oyama,Fukuroi-city,Shizuoka 437-0056, Japan
TEL:0538-42-4103 FAX:0538-42-0628

●Flexible hoses
●Expansion joints (bellows)
●Vibration absobers
●Flexible hoses conforming to Fire Service Act
●Teflon hoses
●Joint pipes
●Helical pipes

Mar.1912 Succeeded in domestically producing metallic flexible hoses and inauguated production and sales at Minami-dori 5-chome,Shin-machi,Nishi-ku,Osaka.
Dec.1937 Established a company organization with capital of 300,000yen.
Jan.1938 Produced 80 percent of fuel hoses and electric conduits for military and naval aircrafts.
Apr.1948 Relocated the head office at the present address and unified all the Plant.
Dec.1965 The capital was increased to 20 million yen.
Jun.1967 The capital was doubled to 40 million yen accepting a capital increase from the Osaka Small Business Investment Co.,Ltd.
Nov.1968 The then president Koizumi recceived an Academy Prize from International American Scientific Association.
Jan.1969 Had a technical tie-up with Vulcan Australia Limited, and succeeded in domestic production of SIDEWINDER ducts.
Nov.1969 Started construction of Fukuroi First Plant.
Mar.1972 Started construction of Fukuroi Second Plant.
May.1978 Became an authorized factory of American Gas Association.
Dec.1980 Successfully Developed a highly flexible, ultra thin hose [Superfree]
Aug.1982 At the head of the flexible hose industry, acquired type certification from the Japan Fire Protection Equipment and Safety center for products conforming to the Fire Service Act.
Jan.1984 Developed the flexible hose and bellows for piping of vacuum aparatus.
Mar.1986 Developed flexible hose [Hybridflex] and bellows [Hybrid bellows] consisting of metallic and Teflon components.
Jul.1989 Developed [Megaflex®] a flexible hose with inner surface polished, and placed it on the market.
Sept.1990 Developed formed bellows [Pressup bellows®] having the same sectional shape as welded bellows and high flexibility.
Feb.1991 Succeeded in automatic brazing system for flexible hose by using welding robot.
Sept.1991 Developed flexible hose [Hasty-22] using HASTELLOY C-22.
Jun.1992 Completion of No.3 Fukuroi Plant. Achieved a mass production system for large size and long bellows.
Nov.1992 Celebrated the company's 80th anniversary
Jun.1993 The Tokyo sales office was moved to the present location.
Sept.1993 The first private placement bond was issued.
Jan.1995 Established a joint venture named "Beijing BORK Metal Hose Company Limited in Beijing".
Mar.1995 The second private placement bond was issued.
Sept.1996 Developed [New Megaflex®], provided with inner surface polished and vacuum double-melted materials at both pipe end fittings.
Feb.1997 BORK received ISO 9002 certification.
Mar.1998 The Capital was increased to 80 million yen.
Apr.1998 ORK Fukuroi plant (Shizuoka) acquired certification of ISO 9002 quality system.
Jun.1998 Clean-room completed at Fukuroi plant.
Jan.2000 Developed earthquake-proof piping system[Dodge3 Joint®]
Mar.2000 The third private placement bond was issued.
Apr.2001 Developed the smallest flexible hose in the world[3A Super Mini Flex].
Oct.2002 Beijing BORK Metal Hose Company Limited acquired certification of ISO 9001.
May.2003 ORK comprehensively acquired certification of ISO 9001.
Fukuroi plant acquired certification of ISO 14001.
Jul.2003 [Dodge3 Joint®] acquired type certificate of Fire protection Equipment and Safety Center of Japan (FESC)
Apr.2005 ORK comprehensively acquired certification of ISO 14001.
Dec.2006 The fourth, fifth private placement bond were issued.
Sept.2007 Started construction of the Second plant at the Head office, and completed clean rooms.
Dec.2008 Implemented Fukuroi Plant with a vacuum heat-treating furnace.